Visual Materials
A wagonload of new insulators is being taken from Ventura County Power's warehouse in Ventura to the site of the construction of the 33,000-volt line to Castaic
You might also be interested in

Building Ventura County Power Company's Castaic-Saticoy 33,000-volt line, 1907
Visual Materials
Building Ventura County Power Company's Castaic-Saticoy 33,000-volt line, 1907. Pg. 65.
photCL SCE 11 - 00132

Ventura County Power Company's headquarters office in Ventura, about 1910
Visual Materials
Ventura County Power Company's headquarters office in Ventura, about 1910. Pg. 64
photCL SCE 11 - 00130

Southern Sierras Power's El Centro Substation was the terminus of a transmission line from the Bishop Creek Hydro Plants
Visual Materials
Southern Sierras Power's El Centro Substation was the terminus of a transmission line from the Bishop Creek Hydro Plants. It started life as Holton Power Company's gas-electric power plant. Pg. 120.
photCL SCE 11 - 00246

Preparing to pull through some more cable during the construction of a 500kV transmission line
Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: Hoover Dam line construction
Visual Materials
Photographic map of Nevada-California Electric Corporation Transmission Line from Victorville to Boulder (Hoover) Dam site with profiles, tower drawings, as well as photographs of construction camps, tower installations, building tower bases, hanging insulators, stringing conductors, splicing conductor, switching towers, angle towers, angle "AP" type towers, dead end towers, and the Hoover Dam Substation.
photCL SCE

Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone"
Visual Materials
Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone". Pg. 224.
photCL SCE 11 - 00451